TRUESTORE- Providing solutions for large-span bulk material storage and transportation systems, as well as EPC general contracting services

Power Plant Membrane Structure Coal Storage Yard Project

This project is a thermal power plant Membrane structure coal storage yard project, the whole project adopts steel shed truss mold structure, with a span of 170 meters, a length of 135 meters, a height of 59 meters, and a total steel consumption of about 1900 tons. This project is an EPC turnkey project, and the on-site construction is divided into 2 parts: truss ground assembly and hoisting, and mold structure slide installation.

After the truss ground assembly was completed, the truss was lifted in 3 sections according to the span direction.
 

Storage Material: Coal
Application Industry: Thermal Power Plant
Year: 2022
Area: 22950 square meters